Challenge

To construct 1,200 LF of 12’ wide asphalt trail and pedestrian bridge over John Young Parkway and 543 linear feet of box culvert.

Client City of Kissimmee
Location Kissimmee, FL
Contract Value $8,009,724
Schedule Jan 2014 - Oct 2015

Solution

Our project team collaborated with the city and various construction trades to finalize tower design and construction, which minimized extra costs and time. We also used alternative foundation construction techniques to reduce overflow conditions in the canal.

Result

Successful design collaboration during the construction phase helped us achieve a great end result: a signature bridge crossing a four-lane divided roadway entering the town.