Lake Apopka Connector Trail

Challenge

Gibbs & Register was selected to construct a 3.23-mile multi-use trail connecting the existing West Orange Trail along McCormick Road to the Lake Apopka Loop Trail at Magnolia Park. The asphalt pavement/concrete trail will vary from 10 to 14-feet wide.

Client FDOT District 5
Location Apopka, FL
Contract Value $7,994,899
Schedule Dec 2024 - In Progress

Scope of work

The project includes 4,899 feet of concrete sidewalk, 11,963 feet of asphalt trail with ribbon curb, and 100 feet of boardwalk. The trail will also include pedestrian/bicycle picket railing, Type B fencing, signing and markings, sod, and other landscape improvements.

Result

A pathway that will allow pedestrians and bicyclists to safely and comfortably use the trail.

Pinellas Trail South Gap
Next Project