Gibbs & Register was selected to construct a 3.23-mile multi-use trail connecting the existing West Orange Trail along McCormick Road to the Lake Apopka Loop Trail at Magnolia Park. The asphalt pavement/concrete trail will vary from 10 to 14-feet wide.
| Client | FDOT District 5 |
|---|---|
| Location | Apopka, FL |
| Contract Value | $7,994,899 |
|---|---|
| Schedule | Dec 2024 - In Progress |
The project includes 4,899 feet of concrete sidewalk, 11,963 feet of asphalt trail with ribbon curb, and 100 feet of boardwalk. The trail will also include pedestrian/bicycle picket railing, Type B fencing, signing and markings, sod, and other landscape improvements.
A pathway that will allow pedestrians and bicyclists to safely and comfortably use the trail.