The City of St Pete Beach needed roadway construction completed through a phased approach minimizing impact to the neighbors and visitors in the area.
| Client | City of St. Pete Beach |
|---|---|
| Location | St. Pete Beach, FL |
| Contract Value | $10,524,776 |
|---|---|
| Schedule | Jan 2018 - Aug 2019 |
Thanks to our experience and qualifications in roadway construction, we won this bid. The project involved full-depth roadway reclamation, roadway reconstruction, stormwater, water, reclaimed water, and flood control structures. To mitigate the risk of flooding, we created and leveraged alternate drainage designs to accommodate existing utilities.